Industrial

World View Headquarters

New 140,000 SF ground-up metal building that is the new home of Tucson based start-up, World View Enterprises, Inc.
view project

Industrial

Southwest Gas- Sierra Vista, AZ

12,000 SF ground-up facility and new storage yard for Southwest Gas Corp. The facility contains office and warehouse space.
view project

Retail

Wilmot Plaza

Complete revamp of the northeast corner of Broadway and Wilmot in Tucson, Arizona.
view project

Restaurant

Freddy’s Frozen Custard & Steakburgers

This ground-up 3,893 SF, steel-stud shell building and tenant improvement included partition walls, glazing, doors, frames, electrical power and lighting, HVAC, restrooms, accessories and plumbing.
view project

Restaurant

Native Grill & Wings

This project involved new construction of a Tucson location for this award-winning chain known for its signature wings and vibrant atmosphere.
view project

Office

Annex Building

This project was a tenant improvement of a 100-year-old, 4-story building in downtown Tucson.
view project

Medical

Tucson Medical Center West Pavilion Campus Development and Parking Garage

In association with J.E. Dunn Construction, this work added upgraded surgery and patient care areas in the four-story Orthopedic and Surgical Tower, as well as a patient and visitor parking deck.
view project

Medical

TMC Wyatt Medical Office

This project involved exterior facelift of a 30-year-old building, with equipment upgrades and tenant improvements to a sizable medical facility.
view project

Solar

University of Arizona Science and Technology Park

This project involved a 1.6 MW single-axis power plant built for SOLON on 14-acres at the Solar Zone at the University of Arizona Science and Technology Park.
view project

Solar

Tucson Electric Power Tech Park 2

This project involved a 5MW fixed-array solar power plant built for SOLON on 25-acres at the Solar Zone at the University of Arizona Science and Technology Park.
view project

Solar

Tucson International Airport Solar Canopy

This project involved design and construction of the 1-megawatt photovoltaic, fixed-tilt array reaching 20 feet over the main hourly/daily public parking lot at the Tucson International Airport Terminal.
view project

Solar

SOLON Corporation Test Site

This project involved installation of SOLON Corporation's single- and dual-axis trackers at Tucson Electric Power's solar test field.
view project

Solar

Roger Road Wastewater Treatment Facility Solar Plant

This project involved construction of a 1-megawatt solar power plant at the Roger Road Sewer Treatment Plant.
view project

Solar

Black Mountain Solar

This project was a 10 MW single-axis power plant built on 56-acres in Golden Valley, Arizona.
view project

Solar

AstroSol Solar Power Plant

This project was a 6.1 MW fixed-array solar power plant for AstroSol, built on 38-acres at the Solar Zone at the University of Arizona Science and Technology Park.
view project

Retail

Sahuarita Plaza

This project included façade remodel and demolition of a former retail building, as well as tenant improvements for each of the three national tenants.
view project

Retail

QuikTrip

QuikTrip is a top-rated convenience/gasoline retail operation that focuses on key, high-volume locations across eleven states.
view project

Retail

Plaza Palomino

This project was a design-build effort to renovate the shopping center while ensuring that the businesses and offices remained open and customer access was maintained.
view project

Retail

Lazy Days

This RV park expansion, featured on local Tucson television commercials, included an exterior/civil/landscape package that transformed a parking lot into a camping facility.
view project

Retail

El Con Mall

After a demolition of the El Con Mall, projects ranged from renovation of a former department store to a new ground-up construction designed for restaurants and retail.
view project

Retail

Conn’s

This project involved multiple tenant improvements throughout Arizona for this nationwide chain of popular, big-box furniture, home décor and appliance stores.
view project

Restaurant

Zinburger

The Zinburger project involved remodeling an existing bistro restaurant and completely upgrading and changing the decor for an entirely new experience.
view project

Restaurant

Tilted Kilt

A 6,000 SF restaurant tenant improvement for the Celtic-themed sports bar included custom millwork, granite countertops, new HVAC and new kitchen equipment.
view project

Restaurant

Smashburger

Barker Contracting built all four of the Smashburger locations in Tucson and Oro Valley representing an ongoing partnership with the franchise.
view project

Restaurant

Pei Wei

This project was a new build for a Tucson location of Pei Wei, a popular Asian-inspired restaurant chain.
view project

Restaurant

Five Guys Burgers and Fries

These tenant improvements involved multiple Tucson locations for Five Guys Burgers and Fries.
view project

Restaurant

Blanco

The Blanco project was a remodel for a Sam Fox restaurant at La Encantada. The project included shell building modifications and constructing operable roll-up doors to allow for an indoor/outdoor dining experience.
view project

Restaurant

Beyond Bread

This Beyond Bread project modified an old Blockbuster retail space into a new Beyond Bread Bakery and Restaurant.
view project

Office

Texas Instruments

The Texas Instruments project completely renovated two 50,000 SF call center office buildings into new office and lab space, and constructed an expandable 25,000 SF lab building, including 11,000 SF of a Class 1000 clean room.
view project

Office

Synchronoss Tech Call Center

This project was a carefully coordinated, fast-track project completed in phases so the owner could utilize available space to begin training in order to get the business operational as soon as possible.
view project

Office

Stantec

Stantec is a national consulting firm for engineering, architecture, environmental, project management and other services. BCI provided renovations to the Tucson location’s fourth floor space of approximately 13,688 SF.
view project

Office

Oracle Office Building

BCI was general contractor for construction of a new 40,000 SF, two-story office building.
view project

Office

Bellovin & Karnas

This renovation of a 60-year-old building included loft-style offices and colored concrete and original wood floors discovered during demolition.
view project

Medical

University Medical Center North MOHS Clinic

This negotiated contract project constructed a new 2,600 SF clinic at the UMC North Cancer Center.
view project

Medical

Tucson Medical Center Obstetrix Clinic

This Tucson affiliate of Obstetrix Medical Group offers a full range of perinatal health services. The project involved an 8,770 SF conversion of an existing hospital space to an obstetrics clinic.
view project

Medical

Square Compass Children’s Clinic

This project completely renovated the interior of a two-story building. The work was divided into four separate phases, as the facility remained open during construction.
view project

Medical

Northwest Eye Surgery Center

This ophthalmic outpatient surgery facility involved a 6,500 SF addition, including approximately 1,000 SF of administration area.
view project

Medical

CSL Plasma

This series of CSL Plasma projects involve new, state-of-the-art blood plasma collection centers across the United States.
view project

Industrial

Wesco

The Tucson distribution center project for this national electrical supplies and construction materials company was a remodel of existing industrial space.
view project

Industrial

Solon America

This project was a remodel of a 104,000 SF building for manufacturing, research and development and office space.
view project

Industrial

Sion Power

This 65,000 SF research & design facility was a tenant improvement in an existing 104,000 SF building.
view project

Industrial

Medical Systems Logistics

This project involved a 60,000 SF ground-up tilt building.
view project

Industrial

Material Recovery Facility

This project included construction of a 60,000 SF metal building, major site renovation, and relocation and coordination of all major public utilities for the City of Tucson to sort and process recycling materials.
view project

Industrial

Computer Designs

BCI was general contractor for the remodel of an 85,000 SF building for office, warehouse, and manufacturing space for this custom thermoforming tool design company.
view project

Education

University of Phoenix

This renovation was for the Tucson location of the University of Phoenix, a nationwide network of colleges offering both campus and online courses.
view project

Education

Tucson College

The Tucson College project expanded and renovated approximately 30,000 SF of existing office space into a new vocational college.
view project

Education

Digital Technology Academy

This two-story, 21,000 SF steel frame structure with concrete masonry walls is home to a private school.
view project

Community

Santa Cruz Valley United Methodist Church

This project was a new build for Santa Cruz Valley Methodist, a new church located in the growing Sahuarita community twenty-five miles southwest of Tucson.
view project

Community

Our Saviour’s Lutheran Church

Founded in 1945, the church is adjacent to two historical districts. This project involved an activity center and sanctuary remodel for Tucson’s oldest Evangelical Lutheran church.
view project

Community

Green Valley Recreation Center

This project was a 10,000 SF expansion of the existing Green Valley Las Campanas Recreation Center.
view project

Community

Desert Hills Lutheran Church

The Desert Hills Lutheran Church project remodeled and added approximately 13,000 SF to an operating church.
view project

Education

Sonoran Science Academy

This project was a new build for the Sonoran Science Academy, a STEM-focused, college preparatory school serving approximately 850 students and faculty.
view project